Ruiquan CNC chrome aluminium pressure led cold forging die casting mold cost
Beschreibung
anodizing process product press alsi7mg t6 aluminum casting
1
Product detail
Produktname | die casting mold cost |
Größe | Angepasst |
Form | Quadrat,round,angepasst |
Farbe | Angepasst |
Material | Aluminium,Zink |
Oberflächenbehandlung | Anodized |
Verfahren | Gießen,Deburring,Drilling,threading |
Equipments | Die Casting machine, Schimmel, Melting furnace, Air pump, Spraying machine, Take machine, Transmission band, Punching machine, Heat moulding machine, Vacumm machine,etc. |
Packing Detail | a) Export standard carton packing b) If necessary, wooden case will be packed outside |
Lieferzeit | Normalerweise 20 ~ 28 Tage nach Erhalt der Anzahlung |
Business Type | Erstausrüster & Exporting Manufacturing Small orders accepted |
Die casting detail pictures
Product application
Other die casting showcase
Company name | Dongguan RuiQuan Thermal Conduction Co.,LTD. |
Time of establishment | 2003 |
Adresse | Dongguan City,Provinz Guangdong,China |
Hauptprodukte | Aluminum extrusion heat sink,cold forging heat sink,heat disspation module,cooling fan and various kinds of CNC copper and aluminum processing products |
Anwendung | All kinds of electronics dindustry such as computer,television sets,power amplifier,freezer,electrical welding machine,LED lights,charging pile etc |
Vorteile | on time delivery ≥ 98% Customer satisfaction ≥ 99% Routine inspection qualified rate = 100% Customer complaint at most once a quarter |
Question | Antworten |
What if I want existing model? | We have tens of thousands of existing model to provide customers, and detail description with drawings. If there are no identical products, we will find similar products. |
Do you make customized products based on our design drawings? | Jawohl, we are a professional metal fabrication factory with an experienced engineering team to make custom products according to clients’ drawings. |
Was ist mit der Vorlaufzeit? | ample needs 15-20 Tage, Zeitbedarf der Massenproduktion 20-28 days for order quantity more than |
Do you have any MOQ limit for led light order? | Niedriges MOQ, 1pc for sample checking is available |
Wie versenden Sie die Ware und wie lange dauert es, bis sie ankommt?? | Wir versenden in der Regel per DHL, UPS, FedEx oder TNT. Normalerweise dauert es 3-5 Tage anzukommen. Flug- und Seeschifffahrt ebenfalls optional. |
.
Zusätzliche Information
Herkunftsort: | Guangdong, China |
---|---|
Markenname: | RUIQUAN |
Modellnummer: | RQ-2019 |
Shaping-Modus: | Die Casting |
Produktmaterial: | Metall |
Produkt: | Vehicle Mould |
Produktname: | process product press |
Anwendung: | office,heim,Industrie,all places |
Maße: | Angepasst |
Farbe: | Kundenspezifische Farbe |
Vorlaufzeit: | 15-35 Tage |
MOQ: | 1000 Stücke |
Oberflächenbehandlung: | Malerei |
Standard: | ISO9001:2008 |
Größe: | Customer's 3D Drawing |
Qualitätskontrolle: | Professional Inspection |