Customized CNC Machining Red Copper Process Fittings Plumbing Press Copper Tip
Descripción
Information table | ||
Materiales | Metal:Titanio, Aluminio, Acero inoxidable & Acero, Brass | |
El plastico:POM, PEEK, abdominales, Nylon, CLORURO DE POLIVINILO, Acrílico, etc. | ||
Procesando | CNC turning, CNC milling, CNC turn-milled, Laser cutting | |
Tratamiento de superficies | Powder Coated, (Ordinary & Hard) Anodized, Electropolished & Polished, Enchapado, | |
Bead Blasted, Heat treatment, Passivate, Black oxidate, Brushing, Grabado láser | ||
Tolerance | +/-0.005milímetro | |
Tiempo de espera | 1-2 weeks for samples,3-4 weeks for mass production | |
Seguro de calidad | ISO 9001: 2015, SGS, RoHS, TÜV | |
Drawing Accepted | Solid Works,Pro/Engineer, AutoCAD(DXF,DWG), PDF | |
Términos de pago | Garantía comercial, TT, PayPal, WestUnion | |
1.3000 square meters factory mainly provides CNC machining service.
2.ISO certificated, supports third-party verification.
3.Deliver conventional products in 15 days at the soonest.
4.Engineering service provided
Certificaciones
Quote-Products
2.Quotation-PI-PO-Production.
3.Quality check- Final Products.
Embalaje
We are a 3000-square-meter factory located in Shenzhen, Porcelana.
2.How can I get a quote?
Detailed drawings(PDF/STEP/IGS/DWG…) with material, quantity and surface treatment information.
3. Can I get a quote without drawings?
Por supuesto, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation.
4.Will my drawings be divulged if you benefit?
No, we pay much attention to protect our customers’ privacy of drawings, signing NDA is also accepted if need.
5. Can you provide samples before mass production?
Por supuesto, sample fee is needed, will be returned when mass production if possible.
6. How about the lead time?
En general, 1-2 weeks for samples, 3-4 weeks for mass production.
7. como controlas la calidad?
(1)Material inspection–Check the material surface and roughly dimension
(2)Production first inspection–To ensure the critical dimension in mass production
(3)Sampling inspection–Check the quality before sending to the warehouse
(4)Pre-shipment inspection–100% inspected by QC assistants before shipment
8. What will you do if we receive poor quality parts?
Please kindly send us the pictures, our engineers will find the solutions and remake them for you asap.
Información Adicional
Lugar de origen: | Guangdong, Porcelana |
---|---|
Nombre de la marca: | 7 Swords |
Número de modelo: | Disfraz |
Escribe: | Spade Terminal |
Tipo de procesamiento: | Cnc Turning Cnc Milling |
Material: | Metal;El plastico |
MOQ: | 1pieza |
Nuestro servicio: | 24 horas en línea |
Superficie: | cnc turning and milling |
Equipo: | Anodizing |
Tolerance: | 0.5milímetro;0.05milímetro;0.02milímetro |
Certificación: | SGS Report 2018;YO ASI 2018 |
Export Market: | Suecia;Francia;Norway;Australia;the United Stated |
Términos de pago: | 30% Depósito |