DN80 LNG Metering and Loading Skid Cryogenic
La description
Truck Loading Skid (TLS) is composed of support structure and process pipelines, and the support structure is composed of an external frame and a pipe bracket, so that the process pipelines are fixed in all directions to connect to the truck stably. The process pipelines are liquid phase pipeline, gas phase pipeline, vent pipeline and instrument wind pipeline All the valves and instruments are integrated into one frame as a completed loading skid. Typical truck loading skid is mainly composed of strainer, Flowmeter, Pressure gauge, Temperature Transmitter, Flow control valve, pneumatic shut-off valve, relief valve, ball valves, Batch Controller, support structure, etc., for safe and efficient loading LNG from storage tank to truck tank.
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
Caractéristique
* Large screen displays the whole process flow of batch controller, convenient and visual
* to monitor the loading process, Manual mode and IC card mode are both available.
* Detail operation instruction being indicated during opetation.
* The flow rate can be controlled dynarnically through flow control valve in the whole process to achieve optimal flow
rate. the filling process can be automatically finished by controlling the electromagnetic valves of liquid, vapor teturn
and liquid collection pipeline.
* The alarm systerm can monitor the anti-static detection switch and position switch and etc, accoring to the requisition.
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
The warranty period will be 18 months from the date of delivery or 12 months from the date of receiving, whichever is earlier.
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
![](http://u.alicdn.com/js/5v/esite/img/img-placeholder.png)
Tél: +86-21-63177319
www.cclpec.com
Informations Complémentaires
Lieu d'origine: | Jiangsu, Chine |
---|---|
Condition: | Nouveau |
Emplacement de la salle d'exposition: | Aucun |
Spare Parts Type: | Commissioning and Starting up, 2 years spare parts |
Inspection de sortie vidéo: | Fourni |
Rapport d'essai de machines: | Fourni |
Type de commercialisation: | Produit chaud 2019 |
garantie: | 1 An |
Service après-vente fourni: | Support technique vidéo, Service d'entretien et de réparation sur le terrain, Support en ligne, Installation sur le terrain, mise en service et formation |
Principaux arguments de vente: | High Quality with Reasonable Price. |
Emplacement du service local: | Espagne, Malaysia |
Service après-vente: | Service d'entretien et de réparation sur le terrain |
Secteurs applicables: | Énergie & Exploitation minière, Petrochemical |
Nom du produit: | DN80 LNG Metering and Loading Skid Cryogenic |
Packing Length: | 10000mm*2600mm*2000mm |
MOQ: | 1 Set |
Instrument Air Pressure: | 6 Bar |
Nitrogen Purge Pressure: | 6 Bar |
Design Pressure: | 18.5 Bar |
Design Temperature: | 196 ~ +66℃ |
N2 Purge Popeline: | SS304/304L |
Nominal Diameter: | DN80 |
Design Standard: | HG/T 21608, COMME MOI |