מְכִירָה!

TSX Green House Green Single-span Greenhouse For Vegetables Low Cost 8x30m Green House Frame

קטגוריה:

תיאור

TSX  Green House Green Single-span Greenhouse For Vegetables Low Cost 8x30m Green House Frame

תיאור מוצר
Cover material
PO
PE film
פוליקרבונט
Product life
15~20 years
1~5 years
10~15 years
Impact strength
Weak
(Fragile)
Weak
(Torn)
Tough
(250 times of glass)
Light transmission
90%
85%
90%
Light stability
מְעוּלֶה
יריד
מְעוּלֶה,but decline over time
Heat insulation
יריד
יריד
מְעוּלֶה
תחזוקה
Replaceable
Reparable
Replaceable
פרופיל החברה
צור קשר
צור קשר
איש קשר: Joey Xiao
MP:+8615126819250
TEL:+8615126819250
EML:[email protected]
סקייפ:+8615126819250
WeChat:+8615126819250
שאלות נפוצות
– – – 1. ש: מה ה-MOQ שלך(כמות מינימלית להזמנה)?
א: One full 20ft container,mixed acceptable .
– – – 2. ש: What’s your packing methods?
א: Packed in bundle or bulk (customed is accepted).
– – – 3. ש: מה תנאי התשלום שלך?
T/T 30% in advance by T/T ,70% will be before shipment under FOB.
T/T 30% in advance by T/T ,70% against the copy of BL under CIF.
T/T 30% in advance by T/T ,70% LC at sight under CIF.
– – – 4. ש: What’s your delivery time?
א: 10-20 days after received the advance payment .
– – – 5. ש: Are you manufacturer or trader?
א: We are the manufacturer of construction materials for decade years ,TSX Group do domestic market and export business.
– – – 6. ש: Where’s your factory?
א: Our factory is in Tianjin city (near Beijing) afforded enough production ability and earlier delivery time.
– – – 7. ש: האם נוכל לבקר במפעל שלך?
א: מקובל בחום. Once we have your schedule, we will arrange the professional sales team to follow up your case.
– – – 8. ש: Can you supply other scaffolding materials?
א: כן. All related construction materials.
(1) scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)
(2) Scaffolding pipes (1.5′-2.0′)איקס(0.3-12M), hot dipped galvanized/Pre-galvanized /black. BS1139
(3) Steel pipes (ERW steel pipes, Square/ Rectangular tube ,black annealed steel tube)
(4) Steel coupler (pressed/drop forged coupler)
(5) Steel plank with hooks or without hooks
(6) Steel stair case
(7) Screw adjustable base jack
(8) Construction Metal Formwork