Uitverkoop!

TECON Wall Steel Formwork Used in Buildings

Categorie:

Beschrijving

TECON Wall Steel Formwork Used in Buildings

TECON Wall Steel Formwork Used in Buildings
PrijsMAX Panel SizePlywoodPanel Usage TimeLeading Time
$100/SQM3* 1meter12mm Birch Plywood3-5 jaar35 dagen

FAQ

1. How to get a quotation?

You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.

Telefoon: +86-512-65650586

Mobiel: +86-18151096613

2. What is the payment term?

By T/T or L/C.

3. Wat is de doorlooptijd??

For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 tot 15 dagen.

For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 tot 25 dagen.

For other system, the lead time is from 30 tot 45 dagen.

For more accurate lead time, please contact us for specific product based on your quantity.

4. What is the package method?

We have standard steel pallet, wooden pallet etc. which suits to container transportation.

5. Do you have any guarantee on the quality?

We have guarantees on the quality on different product basis.

6. Do you offer buy back system or rental business?

We offer buy back system on some of medium and big scale projects, but we do not have any rental business yet.

7. Do you have on-site supervision service?

Ja, we have on-site supervision service for most of our projects across the world except for a few restriction regions.

8. What benefit we can get from TECON?

From TECON, you can get full range of advanced system with excellent quality, our know-how and in-time service. They will lead to increased productivity, labor saving and great cost down on your site as a result.

9. Are you looking for agent or distributor in our country?

Ja, we are looking for agent or distributor worldwide based on win-win relationship. If you have such experience, capability of investment, as well as business plan & goal, we’d be glad to discuss with you in details. TECON has its special agent and distributor policy waiting to support your success in formwork & scaffolding industry.

10. How to purchase your formwork and scaffolding?

For any order you proceed with TECON will basically follow below steps.

Stap 01. Confirm the PI based on our proposal after technical & commercial communication – by Customer, TECON Overseas Sales team and Technical team

Stap 02. Make the deposit – by Customer
Stap 03. Report on production schedule weekly until completion – by TECON Customer Care team

Stap 04. Execute pre-shipment inspection – by Customer or Third Party Inspection company

Stap 05. Effect the balance payment – by Customer

Stap 06. Arrange the loading and shipment after balance payment – by TECON Customer Care team

Stap 07. Submit the full set of shipping documents via courier after departure – by TECON Customer Care team
Stap 08. Submit the full set of user manual, calculation, shop drawing and assembly drawings – by TECON Overseas Sales team
Stap 09. Site supervision – By TECON Site Supervision team

Extra informatie

Type:

Concrete forwmork

Garantie:

1 Jaar

Klantenservice:

Online technische ondersteuning, Onsite Installation, Training op locatie, Onsite Inspection, Gratis reserveonderdelen

Mogelijkheid tot projectoplossing:

grafisch ontwerp, 3D-modelontwerp, totaaloplossing voor projecten, Consolidatie van verschillende categorieën

Sollicitatie:

Hotel, Wall Concorete construction

Ontwerpstijl:

Traditional

plaats van herkomst:

Jiangsu, China

Merknaam:

TECON

Modelnummer:

HETO

Oppervlakte behandeling:

lassen

Materiaal:

Q345B Steel

Permissible fresh concrete pressure:

60kn

Dikte:

73mm

Voordeel:

Reasuable

service life period:

3-5jaar

Plywood:

Birch

Max panel size:

1*3m

Plywood useage times:

30-60