New designed Low fuel consumption GS12000-TS no-excavate trenchless machine/hdd
Descrição
Rig Weight | 81t | Dimensão (L*W*H) | 21400*3200*3800milímetros |
Max Torque | 250000N·m | Max Push & Pull Force | 12000kN |
Max Rotation Speed | 85rpm | Max Push & Pull Speed | 40m/min |
Max Clamp Force | 2900kN | Max Unscrewing Force of Pipe Jaw | 520000N·m |
Engine Power | 2*565kW, 1*264kW | Max Working Pressure | 35MPa |
Drill Pipe Diameter | Φ168mm-Φ254mm | Max Length of Drill Pipe | 9.6m |
Entry Angle | 8°-18° | Power Station Size(L*W*H) | 6100*2500*2700milímetros |
Main Spidle Floating Distance | 140 milímetros | Mud Pipe Channel Diameter | 101.6milímetros |
Max Mud Floating Volume | 3000L/min | Max Mud Pressure | 20MPa |
Permitted Environment Temperature | -30°C-50°C | Permitted Environment Humidity | >90% |
Max Aperture Diameter | ø2000mm (Soil Depended) | Max Crossing Length | 3000m (Soil Depended) |
1.Three sets high-power engine can meet different working conditions.
2. Dual structure and submerged design of gear box.
3. Driving head adopts main shaft floating design.
4. Brand-new optimized four-point clamp, the improvement of structure stiffness, strength, cylinder strength and the increase of unscrewing torque making it easy to change the grips.
5. Optional heavy-duty automatic manipulator is Goodeng patent to relieve the heavy labor work.
6. Application of intelligent electrical-hydraulic combined control and monitor system
7. Application of clutch patented technology.
8. Rod rebound energy recycle and release system (core technology).
9. Advanced electric proportional hydraulic control system.
10.Main body is designed as trailer, and it can be transported directly on ordinary road.
11.The operation cabin is capacious and bright with humanized bench board.
12.Main rig is fitted with nonslip passage and guardrail.
1. What about the warranty time?
UMA:12 months after shipment or 2000 working hours, whichever occurs first.
2. What about the delivery time?
UMA:20 days after receiving the deposit.
3.What kind terms of payment can be accepted?
UMA: On T/T term, 30% down payment is required in advance, e 70% balance shall be before shipment, or against the copy of original BL for old client.
On L/C term, 100% irrevocable L/C without “soft clause” can be accepted.
4.What logistics ways we can work for shipment?
UMA: We can ship machine by sea and road.
5. What about the after-sales service?
UMA: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.
Informação adicional
Doença: | Novo |
---|---|
garantia: | 1.5 anos |
Indústrias aplicáveis: | obras de construção |
Lugar de origem: | China |
Serviço pós-venda fornecido: | Engenheiros disponíveis para atender máquinas no exterior |
UNIQUE SELLING POINT: | High operating efficiency |
Max Push&Pull Force: | 12000kN |
Max Aperture Diameter: | 2000milímetros |
Max Crossing length: | 3000m |
Engine Power: | 1394kW |
Max Torque: | 250000Nm |
Max Clamp Force: | 2900kN |
Max Working Pressure: | 35MPa |
Max Unscrewing Force of Pipe Jaw: | 520000Nm |