New designed Low fuel consumption GS12000-TS no-excavate trenchless machine/hdd

Descrição

New designed Low fuel consumption GS12000-TS  no-excavate trenchless machine/hdd

Rig Weight81tDimensão (L*W*H)21400*3200*3800milímetros
Max Torque250000N·mMax Push & Pull Force12000kN
Max Rotation Speed85rpmMax Push & Pull Speed40m/min
Max Clamp Force2900kNMax Unscrewing Force of Pipe Jaw520000N·m
Engine Power2*565kW, 1*264kWMax Working Pressure35MPa
Drill Pipe DiameterΦ168mm-Φ254mmMax Length of Drill Pipe9.6m
Entry Angle8°-18°Power Station Size(L*W*H)6100*2500*2700milímetros
Main Spidle Floating Distance140 milímetrosMud Pipe Channel Diameter101.6milímetros
Max Mud Floating Volume3000L/minMax Mud Pressure20MPa
Permitted Environment Temperature-30°C-50°CPermitted Environment Humidity>90%
Max Aperture Diameter ø2000mm
(Soil Depended)
Max Crossing Length 3000m
(Soil Depended)

1.Three sets high-power engine can meet different working conditions.

2. Dual structure and submerged design of gear box.

3. Driving head adopts main shaft floating design.

4. Brand-new optimized four-point clamp, the improvement of structure stiffness, strength, cylinder strength and the increase of unscrewing torque making it easy to change the grips.

5. Optional heavy-duty automatic manipulator is Goodeng patent to relieve the heavy labor work.

6. Application of intelligent electrical-hydraulic combined control and monitor system

7. Application of clutch patented technology.

8. Rod rebound energy recycle and release system (core technology).

9. Advanced electric proportional hydraulic control system.

10.Main body is designed as trailer, and it can be transported directly on ordinary road.

11.The operation cabin is capacious and bright with humanized bench board.

12.Main rig is fitted with nonslip passage and guardrail.

1. What about the warranty time?

UMA:12 months after shipment or 2000 working hours, whichever occurs first.

2. What about the delivery time?

UMA:20 days after receiving the deposit.

3.What kind terms of payment can be accepted?

UMA: On T/T term, 30% down payment is required in advance, e 70% balance shall be before shipment, or against the copy of original BL for old client.

On L/C term, 100% irrevocable L/C without “soft clause” can be accepted.

4.What logistics ways we can work for shipment?

UMA: We can ship machine by sea and road.

5. What about the after-sales service?

UMA: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.

Informação adicional

Doença:

Novo

garantia:

1.5 anos

Indústrias aplicáveis:

obras de construção

Lugar de origem:

China

Serviço pós-venda fornecido:

Engenheiros disponíveis para atender máquinas no exterior

UNIQUE SELLING POINT:

High operating efficiency

Max Push&Pull Force:

12000kN

Max Aperture Diameter:

2000milímetros

Max Crossing length:

3000m

Engine Power:

1394kW

Max Torque:

250000Nm

Max Clamp Force:

2900kN

Max Working Pressure:

35MPa

Max Unscrewing Force of Pipe Jaw:

520000Nm