Meltblown Cloth Extruder Machine 1600Mm Melt Blown Nonwoven Fabric Cloth Production Line
Description
Specification
Singlerow meltblown nonwoven fabric making machine/line | ||||||||||
Effective Width (mm) | Raw Materials | GSM Range (g/sq.m) | Max Speed (m/min) | Annals Capacity (Tons/Year) | Daily Capacity (Tons/Day) | |||||
1600 | Polypropylene (PP) | 8-80 | 100 | 850 | 2.5 | |||||
2400 | 1300 | 3.6 | ||||||||
3200 | 1700 | 4.8 | ||||||||
4200 | 2300 | 6.4 | ||||||||
The configuration of machinescould be customization as your needs! |
FAQ
1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material,
power source, air compressor etc.Prepared)
2. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine
installation experience.
3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer’s air tickets, hotel, food, and also their salary
800CNY one day per person.
4. Q:How many days it will take for the intallation?
A: It will take around 45 days, depends on the machine type.
5. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any
problem, you can contact our sales at any time. Our engineers will take a solution video according
your description.
A:Within one week after everything ready (machine arrival your factory, non woven material,
power source, air compressor etc.Prepared)
2. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine
installation experience.
3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer’s air tickets, hotel, food, and also their salary
800CNY one day per person.
4. Q:How many days it will take for the intallation?
A: It will take around 45 days, depends on the machine type.
5. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any
problem, you can contact our sales at any time. Our engineers will take a solution video according
your description.
Additional information
Applicable Industries: | Hotels, Garment Shops, Machinery Repair Shops, Farms, Home Use, Energy & Mining, Food & Beverage Shops |
---|---|
After Warranty Service: | Video technical support, Online support, Field maintenance and repair service |
Local Service Location: | None |
Showroom Location: | None |
Video outgoing-inspection: | Provided |
Machinery Test Report: | Provided |
Marketing Type: | New Product 2020 |
Warranty of core components: | 1 Year |
Core Components: | Engine, Bearing, Gearbox, Motor |
Condition: | New |
Automatic Grade: | Automatic |
Brand Name: | YIHONGTONG, YIHONGTONG |
Warranty: | 1 Year |
After-sales Service Provided: | Video technical support, Online support, Field installation, commissioning and training, Field maintenance and repair service |
Key Selling Points: | Automatic, Patented Product |
Voltage: | According to customer |
Technology: | Meltblown |
Raw Material: | Polypropylene (PP) |
Eft. Width Range: | 1200~4200mm |
Max. Speed: | 100m/min |
GSM Range: | 8~80g/sq.m |
Daily Capacity: | 6.5 T/d |
Appliactions: | Sanitary, Absorbents, Filtration |