Meltblown Cloth Extruder Machine 1600Mm Melt Blown Nonwoven Fabric Cloth Production Line
La description
spécification
Singlerow meltblown nonwoven fabric making machine/line | ||||||||||
Effective Width (mm) | Raw Materials | GSM Range (g/sq.m) | Vitesse maximale (m/min) | Annals Capacity (Tons/Year) | Daily Capacity (Tons/Day) | |||||
1600 | Polypropylene (PP) | 8-80 | 100 | 850 | 2.5 | |||||
2400 | 1300 | 3.6 | ||||||||
3200 | 1700 | 4.8 | ||||||||
4200 | 2300 | 6.4 | ||||||||
The configuration of machinescould be customization as your needs! |
FAQ
1. Q:How long will your engineer reach our factory?
UN:Within one week after everything ready (machine arrival your factory, non woven material,
power source, air compressor etc.Prepared)
2. Q:Does your engineer understand English?
UN:Our engineers understand a little English. All our engineers have more than five years machine
installation experience.
3. Q:What should we charge for your engineer?
UN:You should charge for the cost of our engineer’s air tickets, Hôtel, aliments, and also their salary
800CNY one day per person.
4. Q:How many days it will take for the intallation?
UN: It will take around 45 journées, depends on the machine type.
5. Q:How do we solve the machine problem after your engineer leaving?
UN:En général, there will be no problem after finishing installation. In case you have any
problem, you can contact our sales at any time. Our engineers will take a solution video according
your description.
UN:Within one week after everything ready (machine arrival your factory, non woven material,
power source, air compressor etc.Prepared)
2. Q:Does your engineer understand English?
UN:Our engineers understand a little English. All our engineers have more than five years machine
installation experience.
3. Q:What should we charge for your engineer?
UN:You should charge for the cost of our engineer’s air tickets, Hôtel, aliments, and also their salary
800CNY one day per person.
4. Q:How many days it will take for the intallation?
UN: It will take around 45 journées, depends on the machine type.
5. Q:How do we solve the machine problem after your engineer leaving?
UN:En général, there will be no problem after finishing installation. In case you have any
problem, you can contact our sales at any time. Our engineers will take a solution video according
your description.
Informations Complémentaires
Secteurs applicables: | Hotels, Garment Shops, Ateliers de réparation de machines, Farms, Home Use, Énergie & Exploitation minière, Aliments & Magasins de boissons |
---|---|
Service après-vente: | Support technique vidéo, Support en ligne, Service d'entretien et de réparation sur le terrain |
Emplacement du service local: | Aucun |
Emplacement de la salle d'exposition: | Aucun |
Inspection de sortie vidéo: | Fourni |
Rapport d'essai de machines: | Fourni |
Type de commercialisation: | Nouveau produit 2020 |
Garantie des composants de base: | 1 An |
Composants principaux: | Moteur, Palier, Boîte de vitesses, Moteur |
Condition: | Nouveau |
Note automatique: | Automatique |
Marque: | YIHONGTONG, YIHONGTONG |
garantie: | 1 An |
Service après-vente fourni: | Support technique vidéo, Support en ligne, Installation sur le terrain, mise en service et formation, Service d'entretien et de réparation sur le terrain |
Principaux arguments de vente: | Automatique, Patented Product |
Tension: | According to customer |
Technologie: | Meltblown |
Matière première: | Polypropylene (polypropylène) |
Eft. Width Range: | 1200~4200mm |
Max. La rapidité: | 100m/min |
GSM Range: | 8~80g/sq.m |
Daily Capacity: | 6.5 T/d |
Appliactions: | Sanitary, Absorbents, Filtration |